North Golestan-Setare Omran Zamin

Project Information

  • Architect: Mohammad Reza Nikbakht
  • Year: 2019
  • Type: Residential
  • Area: 9280.75 Square meters
  • Clients: Setare Omran Zamin Co.
  • Team: Shahriar Ghasemi, Bita Borna, Mehdi Farajollah Pour, Hesam Pour Sarafi, Alireza Nateghi, Shahrzad Nikbakht, Shaghayegh Abrishami, Hale Tamadon Nejad, Shahrzad Shahnam
  • Photography: Mohammadhasan Ettefagh, Niloufar Abounoori
  • Presentation: Negar Khodadi
  • Structural Consultant: Mr Sajjadian
  • Mechanical Consultant: Mr Mohammadi
  • Electrical Consultant: Mr Azmayesh
  • location: Park1 St, Laleh St, North Golestan, Aqdasiyeh, Tehran, Iran

This building is located in the Aghdasieh area (Northern Golestan). It is situated on a land area of 1,331 square meters, consisting of three basement levels that include a celebration hall, parking areas, and storage rooms, as well as a ground floor with a lobby, swimming pool, sports hall, and eight residential floors, each containing a main unit of 476 square meters and a suite of 77 square meters. The design and construction began in 2015.

The console designs for the even and odd floors of this building are different from each other, and the façade materials include cement and stone, with wooden partitions in some areas of the windows.